Sam’s Club
The Next-Generation Warehouse, Modeled in 3D
As one of two firms selected, we developed the standards, processes, and quality controls that ensured consistent accuracy across every model. Using LiDAR scanning and Revit, our team delivered highly detailed, peer-reviewed as-builts that now serve as the digital backbone for remodel and facility maintenance programs.


We optimized the scan-to-BIM process with automation routines that reduced production time and increased accuracy. A mid-project pivot to support a digital twin initiative enabled Sam’s Club to move beyond architecture into data-driven operations, guided by a comprehensive BIM Execution Plan.



This effort was more than a deliverable—it was a partnership. Transparency, shared problem-solving, and trust shaped every milestone, resulting in survey, scan, and point cloud delivery for 240 clubs and a digital foundation that empowers Sam’s Club to adapt faster and operate smarter at scale.




