Save the Meatballs

IKEA

What did we do?

Put the value in value engineering in the big blue box

Reduced overall cost of a new buildout

Utilized BIM technology to identify more efficient design strategies

Doubled the client’s savings goal by reducing prototype buildout costs by 8%

Some assembly required


Architecture & Engineering

Used value engineering process to streamline everything from the store layout and construction timeline to the communications between the client team and the agency team